Service · Sacramento metro

Kitchen remodels in Sacramento.

A kitchen remodel replaces the layout, cabinets, surfaces, lighting and appliances as one designed project, for Sacramento-area homeowners who want the room planned as a whole.

8–14 weeks typical

Questions we hear a lot

Kitchen remodels FAQ.

How long does a kitchen remodel take?

Eight to fourteen weeks of construction once design and permits are done. Cabinet lead times are usually the long pole. We order early so they land when we need them.

Can we use the kitchen during the remodel?

During demo and rough-in, no. We help you set up a temporary kitchen so the disruption is manageable.

Do you handle design, or do we need our own?

We design and build under one roof. Floor plans, 3D renders, and finish selections are part of the process before any quote.

Will we need a permit?

Most kitchen remodels that move plumbing, gas, or electrical need one. We handle the city or county filing for you.

Do new cabinets and countertops alone need a permit?

In the City of Sacramento, usually not. Cabinets, countertops, tiling and similar finish work are on the City’s list of work exempt from a permit, except in a design review or preservation district or on a historic landmark. Moving a light or outlet to fit the new layout can need one. Sacramento County points to section 105.2 of the California Residential Code for work that is exempt.

Can you take out the wall between the kitchen and the living room?

Yes, when an engineer sizes a beam to carry the load. Removing a wall needs a permit that goes through plan review. On our Carmichael remodel an engineer specified a 16-foot W12 steel beam, which opened the kitchen to the living room without dropping the ceiling.

Will an older house need an electrical upgrade for a new kitchen?

Often. The 60- and 100-amp services common in 1950s to 1970s Sacramento-area houses will not carry a modern kitchen. We check the service size before we price the job.

Is the kitchen price fixed?

It depends on size. Small and mid-size kitchens can get one line-itemed fixed price. Large projects are open-book cost-plus: materials and labor at cost, shown with receipts, plus a 10 to 15 percent contractor fee. If you change the scope, the change is priced and approved by you before the work happens.

How long before construction starts?

Plan on about three weeks of design, then permitting, which typically takes four to eight weeks for moderate scope. Cabinets are ordered early so they arrive when the build needs them.

How will we know what is happening during the build?

One named project manager is on site from day one and sends weekly photo updates by text.

Related guide: Do I need a permit to remodel my kitchen in Sacramento?