Bathroom remodels in Sacramento.
A bathroom remodel rebuilds the room down to plumbing, waterproofing and tile, for Sacramento-area homeowners whose bathroom has worn out or no longer works for them.
4–10 weeks typical
Bathroom remodels we've done.
Questions we hear a lot
Bathroom remodels FAQ.
How long does a bathroom remodel take?
Four to ten weeks depending on scope. A guest bath is quicker than a primary suite with a custom shower.
What's the most common surprise in a bath remodel?
Water damage or old plumbing behind the walls. We budget a contingency and flag anything we find before we proceed.
Can you match the rest of the house?
Yes. We'll pull finishes and fixtures that work with your existing style, or take the whole palette in a new direction if that's the goal.
Do you handle permits?
Yes. Anything touching plumbing or electrical typically needs one; we file it.
Can we stay in the house during a bathroom remodel?
Normally, yes. You will be without that bathroom during demo and rough-in.
Will you replace old supply pipes?
If they are failing, yes, and in pre-1960 houses they often are. Galvanized steel supply pipe from that era is corroded and undersized by now, so opening a bathroom wall often turns into a partial repipe.
Should we test for asbestos or lead before demolition?
In a 1950s to 1970s house, yes. Assume asbestos until tested: popcorn ceiling texture, 9x9 and 12x12 vinyl floor tile and the black mastic under it are the usual sources. Work in pre-1978 housing falls under the EPA’s lead Renovation, Repair and Painting rule, which requires lead-safe work practices.
Will we see the design before you quote?
Yes. Floor plans, 3D renders and finish selections come first, then the quote.
Is the bathroom price fixed?
It depends on size. Small and mid-size bathrooms can get one line-itemed fixed price. Large projects are open-book cost-plus: materials and labor at cost, shown with receipts, plus a 10 to 15 percent contractor fee. Anything found behind the walls is priced and approved by you before work continues.
Who runs the job?
One named project manager, on site from day one, with weekly photo updates by text and a punch list closed before final payment.
Related guide: Sacramento remodel permits: who issues yours