Additions & ADUs in Sacramento.
Additions and ADUs add living space: first-floor additions, second-story pop-ups and detached ADUs, for Sacramento-area owners who need room without moving. We handle Sacramento County permits.
12–28 weeks typical
Straight answer
We haven't photographed an ADU yet.
Rather than pad this page with someone else's work, here's what we actually know: which building department reviews your project, what each Sacramento-area jurisdiction allows, and where ADU budgets really move. Additions and ADUs draw more plan-check scrutiny than any other residential work, and getting the package right the first time is most of the timeline.
Read the Sacramento ADU guide →Questions we hear a lot
Additions & ADUs FAQ.
How long does an addition or ADU take?
Twelve to twenty-eight weeks of construction, plus design and a longer permit timeline than interior work. Additions and ADUs get more plan-check scrutiny.
Do you handle the permits and zoning?
Yes. We manage Sacramento County and city filings, setbacks, and plan check. ADUs have their own streamlined path in many jurisdictions.
Can you match the addition to the existing house?
That's the goal: rooflines, siding, and windows that read as original, not bolted-on.
Will an ADU need its own utilities?
Often yes: separate electrical, sometimes water and sewer connections. We scope it during design.
Which building department reviews my addition or ADU?
The one for your address, not your ZIP code. The City of Sacramento reviews projects inside city limits and Sacramento County reviews unincorporated areas such as much of Carmichael and Fair Oaks. Folsom, Rancho Cordova, Citrus Heights, Elk Grove and Roseville each run their own.
How long can the agency take to approve an ADU permit?
Sixty days for a complete application under California law; after that it is deemed approved. Since January 2026 the agency also has 15 business days to decide whether the application is complete. An incomplete package restarts the practical timeline.
Do I have to live on the property to build an ADU?
No. State law bars an owner-occupancy requirement for an ADU. A junior ADU can carry one only where it shares sanitation facilities with the main house, a rule in effect since January 1, 2026.
Are there pre-approved ADU plans?
Yes. The City of Sacramento publishes free Shelf Ready ADU plans in studio, one-bedroom and two-bedroom versions, and Sacramento County runs a similar program for unincorporated areas. Where a pre-approved plan is used, state law shortens the approval window to 30 days.
Do oak trees affect where an addition can go?
Often. In unincorporated Sacramento County the Tree Preservation Ordinance bars trenching, grading or filling within the dripline of a protected tree without a tree permit, and that dripline often covers footings and utility trenches. We check the canopy before we fix the foundation and utility routes.
Can an addition count as a demolition?
In the City of Sacramento it can. A permit to demolish part of a house 50 years or older, 50 or more linear feet of exterior wall or more than half the footprint, is referred to the City’s Preservation Director. A large rear addition can cross that line, so we check it at design stage.
Thinking about an addition or ADU?
Book a free 30-minute design consultation. We'll talk through your home and tell you honestly if we're the right fit.