Service · Sacramento metro
Outdoor living & pools in Sacramento.
Outdoor living work builds pools, hardscape, pergolas and outdoor kitchens, for Sacramento-area homeowners who want to use the backyard as a second living room.
10–22 weeks typical
Questions we hear a lot
Outdoor living & pools FAQ.
How long does an outdoor project take?
Ten to twenty-two weeks depending on scope. A pool with hardscape and an outdoor kitchen takes longer than a deck and pergola.
Do you handle pool permits?
Yes. Pools, gas lines, and electrical for outdoor kitchens all need permits and inspections; we manage them.
Can you work with our existing yard and grade?
Yes. We design around the lot, drainage, and how you actually want to use the space.
What holds up best in Sacramento's climate?
We'll steer you toward materials that handle the heat and sun: composite decking, the right hardscape, and shade structures that make the yard usable in summer.
Can you design the pool, hardscape and outdoor kitchen together?
Yes. We design and build under one contract, with floor plans and 3D renders before any quote, so the pieces are planned as one yard.
Do trees on the lot limit where a pool can go?
Often. Unincorporated Sacramento County bars trenching, grading or filling within the dripline of a protected tree without a tree permit. The City of Sacramento’s tree ordinance covers native oaks and grading, excavating and trenching. Folsom protects native oaks from 6 inches, and Placer County protects most native trees from 6 inches.
Does buried gas or water pipe need special protection?
In the City of Sacramento, yes. The City amends the plumbing code to require cathodic protection on buried metallic piping because of local soil conditions, which affects gas and water runs to a pool or outdoor kitchen.
Do we need HOA approval for backyard work?
If your home has CC&Rs, plan on it. Many homes in Granite Bay and El Dorado Hills sit in associations with architectural review, and county permit review does not check CC&Rs. You need both approvals.
Will grading need its own permit?
Sometimes. In Placer County, which covers Granite Bay, a grading permit is generally required where grading exceeds 250 cubic yards and four feet of vertical cut or fill. We scope grading during design.
Is the price fixed?
It depends on size. Small and mid-size projects can get one line-itemed fixed price. Large projects are open-book cost-plus: materials and labor at cost, shown with receipts, plus a 10 to 15 percent contractor fee. Any change is priced and approved by you before it is built.
Thinking about an outdoor project?
Book a free 30-minute design consultation. We'll talk through your home and tell you honestly if we're the right fit.
Book a consultation